Power plant · Melton, England, United Kingdom

Twyford, Melton - Solar Farm

Twyford, Melton - Solar Farm is a permitted power plant in Melton, England, United Kingdom, with 10 MW of capacity, operated by Noventum Power Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationMelton (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressTwyford, Melton, LE14 2HZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date27 Nov 2024 (permit 23/00870/FUL, Town and Country Planning Act, issued by Melton)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date11 Oct 2023 (reference 23/00870/FUL, planning authority Melton)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date27 Nov 2024 (granted, reference 23/00870/FUL, planning authority Melton)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNoventum Power Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity10 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area16 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.6825, -0.9233DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Melton, reference 23/00870/FUL)
  2. Permit applied for (planning authority Melton, reference 23/00870/FUL)

How it compares

Twyford, Melton - Solar Farm is the 1,157th-largest of 1,651 power plants planned, permitted or under construction in England and the 1,858th-largest of 2,549 in the United Kingdom by capacity; its 10 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,157th of 1,651172,174 MW<0.1%
United Kingdom1,858th of 2,549279,978 MW<0.1%
All power plants planned, permitted or under construction in our data4,928th of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 9 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
Weston Marsh to East LeicestershireTransmission line—Planned13 km
Santander data center, EnglandData center——22 km
Santander data center, EnglandData center——23 km
The Horizon CentreData center——26 km

Operator and place

More from Noventum Power Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page