Power plant · Winchester, England, United Kingdom

Titchfield Lane, Wickham - Solar Panels

Titchfield Lane, Wickham - Solar Panels is a permitted power plant in Winchester, England, United Kingdom, with 49.9 MW of capacity, operated by Conrad Energy II Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWinchester (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressTitchfield Lane Wickham, PO17 5NZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date25 Sept 2025 (permit 24/02804/FUL, Town and Country Planning Act, issued by Winchester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date3 Feb 2025 (reference 24/02804/FUL, planning authority Winchester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 Sept 2025 (granted, reference 24/02804/FUL, planning authority Winchester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorConrad Energy II Limited (Conrad Energy (Developments) II Limited)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area63 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.9027, -1.1999DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Titchfield Lane, Wickham - Solar Panels is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England514th of 2,174186,088 MW<0.1%
United Kingdom886th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,966th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 244 grid connections (138 operating, 1,291 MW), 185 substations, 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Higglers Farm grid connectionGrid connection50 MWPlanned1.4 km
Wickham PV Plant grid connectionGrid connection49.9 MWPlanned1.4 km
Battery storage 49.9 MW grid connection at Botley WoodGrid connection49.9 MWOperating2.2 km
Botley Wood BSPSubstation——3.0 km
Botley Wood GSPSubstation——3.0 km
Regit4uData center——3.5 km
North Fareham PrimarySubstation——4.3 km
ServerhouseData center——5.0 km
AstrohouseData center——5.0 km

Operator and place

Grid connections attached to this power plant

More from Conrad Energy II Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page