Power plant · Rotherham, England, United Kingdom
Claire Court, Rawmarsh Road - Battery Energy Storage Facility
Claire Court, Rawmarsh Road - Battery Energy Storage Facility is a permitted power plant in Rotherham, England, United Kingdom, with 40 MW of capacity, operated by Conrad Energy II Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Rotherham (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Claire Court, Rawmarsh Road, Northfield, S60 1RU | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 20 Jun 2023 (permit RB2023/0542, Town and Country Planning Act, issued by Rotherham) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 18 Apr 2023 (ref. RB2023/0542, Rotherham) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 20 Jun 2023 (granted, ref. RB2023/0542, Rotherham) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Conrad Energy II Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 40 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.4367, -1.3535 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Claire Court, Rawmarsh Road - Battery Energy Storage Facility is the 836th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,342nd-largest of 3,222 in the United Kingdom by capacity; its 40 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 836th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 1,342nd of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,556th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 501 grid connections (195 operating, 2,035 MW), 309 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Rawmarsh Road 1_2 Direct | Substation | — | — | 0.2 km |
| Rawmarsh Road 3_4 Direct | Substation | — | — | 0.2 km |
| Gas 8 MW grid connection at Park Street Direct | Grid connection | 8 MW | Operating | 1.3 km |
| Park Street Direct | Substation | — | — | 1.4 km |
| Battery storage and Solar 2.12 MW grid connection at Templeborough 33/11kV | Grid connection | 2.12 MW | Operating | 1.7 km |
| Biomass 42.75 MW grid connection at Templeborough Biomass | Grid connection | 42.8 MW | Operating | 2.0 km |
| North Humber to High Marnham | Transmission line | — | Planned | 32 km |
| Chesterfield to Willington | Transmission line | — | Planned | 45 km |
Operator and place
More from Conrad Energy II Limited
- Oaklands Farm, New Road - Battery Energy Storage70 MW · permitted
- Titchfield Lane, Wickham - Solar Panels49.9 MW · permitted
- Catsbrain Farm - Battery Storage30 MW · permitted
- Midsomer Norton - Battery Energy Storage System6 MW · under construction
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.