Power plant · Swindon, England, United Kingdom

Catsbrain Farm - Battery Storage

Catsbrain Farm - Battery Storage is a permitted power plant in Swindon, England, United Kingdom, with 30 MW of capacity, operated by Conrad Energy II Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSwindon (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressN/O Kingsdown Road & West Of Catsbrain Farm Swindon, SN3 4TDDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date3 Oct 2023 (permit S/22/1051, Town and Country Planning Act, issued by Swindon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date11 Jul 2022 (reference S/22/1051, planning authority Swindon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date3 Oct 2023 (granted, reference S/22/1051, planning authority Swindon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorConrad Energy II Limited (Conrad Energy (Developments) II Limited)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity30 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6013, -1.7459DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Swindon, reference S/22/1051)
  2. Permit applied for (planning authority Swindon, reference S/22/1051)

How it compares

Catsbrain Farm - Battery Storage is the 991st-largest of 2,174 power plants planned, permitted or under construction in England and the 1,569th-largest of 3,222 in the United Kingdom by capacity; its 30 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England991st of 2,174185,888 MW<0.1%
United Kingdom1,569th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data2,981st of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 211 grid connections (116 operating, 1,317 MW), 141 substations and 10 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Stratton PrimarySubstation——0.8 km
Stratton (Main) BSPSubstation——0.8 km
Stratton (Reserve) BSPSubstation——0.8 km
Sevor Farm Solar grid connectionGrid connection19 MWOperating0.9 km
nLighten SwindonData center——1.1 km
Melk Corner Corpse Solar - PV grid connectionGrid connection49.9 MWPlanned1.1 km
Solar 3.5 MW grid connection at Stanton FitzwarrenGrid connection3.5 MWOperating1.1 km
Nationwide Swindon Technology CentreData center——7.1 km
AWS Swindon Data CentreData center——8.7 km

Operator and place

More from Conrad Energy II Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page