Power plant · New Forest, England, United Kingdom

Thornlands Farm, Fletchwood Road - Solar Farm

Thornlands Farm, Fletchwood Road - Solar Farm is a cancelled power plant in New Forest, England, United Kingdom, with 12 MW of capacity, operated by Enviromena Asset Management UK Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNew Forest (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressThornlands Farm, Fletchwood Road, Southampton, SO40 7DXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date29 Feb 2024 (reference 23/01683FULL, planning authority New Forest)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date18 Jun 2024 (refused, reference 23/01683FULL, planning authority New Forest)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEnviromena Asset Management UK Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity12 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area9.85 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.9121, -1.5180DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority New Forest, reference 23/01683FULL)
  2. Permit applied for (planning authority New Forest, reference 23/01683FULL)

How it compares

Thornlands Farm, Fletchwood Road - Solar Farm is the 1,208th-largest of 3,953 power plants in England and the 2,000th-largest of 5,723 in the United Kingdom by capacity; its 12 MW is <0.1% of the 136,106 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,208th of 3,95385,679 MW<0.1%
United Kingdom2,000th of 5,723136,106 MW<0.1%
All power plants in our data6,548th of 12,7051,210,931 MW<0.1%

Nearby

Within 50 km of this power plant: 219 grid connections (125 operating, 1,155 MW), 187 substations, 8 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Fletchwood PrimarySubstation——0.5 km
Fletchwood Solar Farm grid connectionGrid connection5 MWPlanned0.6 km
5.88MW BESS grid connectionGrid connection5.88 MWPlanned0.6 km
Totton PrimarySubstation——2.0 km
Land to the East of Marchwood Bypass grid connectionGrid connection49.9 MWPlanned3.4 km
Nursling GSPSubstation——3.8 km
Sky ChilworthData center——8.4 km
Regit4uData center——19 km
SCCData center——20 km

Operator and place

More from Enviromena Asset Management UK Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page