Power plant · Hart, England, United Kingdom
Kiln Fields Solar Farm
Kiln Fields Solar Farm is a power plant under construction in Hart, England, United Kingdom, with 17.9 MW of capacity, operated by Enviromena Asset Management UK Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Hart (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Lying To The N/O Vicarage Lane, Hound Green, Hook, RG27 8LH | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Under construction | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 20 Dec 2021 (permit 21/02749/FUL, Town and Country Planning Act, issued by Hart) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 10 Nov 2021 (reference 21/02749/FUL, planning authority Hart) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 20 Dec 2021 (granted, reference 21/02749/FUL, planning authority Hart) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Enviromena Asset Management UK Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 17.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 30 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.3281, -0.9589 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Kiln Fields Solar Farm is the 1,309th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,049th-largest of 3,222 in the United Kingdom by capacity; its 17.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,309th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 2,049th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 4,205th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 242 substations, 198 grid connections (101 operating, 1,047 MW), 84 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Generation 15 MW grid connection at Basingstoke | Grid connection | 15 MW | Operating | 1.1 km |
| Catsbrain Farm Export grid connection | Grid connection | 19 MW | Operating | 3.2 km |
| Bramley Green Primary | Substation | — | — | 5.2 km |
| Holt Lane Solar Park grid connection | Grid connection | 22 MW | Planned | 5.4 km |
| Hook Primary | Substation | — | — | 5.5 km |
| Arborfield Primary | Substation | — | — | 7.3 km |
| Redcentric Reading | Data center | — | — | 10 km |
| Asanti - Reading | Data center | — | — | 11 km |
| Pulsant Reading SL3 | Data center | — | — | 11 km |
Operator and place
More from Enviromena Asset Management UK Limited
- Park House Farm, Meriden Road - Solar Farm47.7 MW · permitted
- Marr Hall Farm, Barnsley Road - Solar Farm40 MW
- Parley Court - Solar Farm35 MW · permitted
- West Sleekburn - Battery Storage Compound30 MW · permitted
- Horsey Levels - Solar Farm24 MW
- Thornlands Farm, Fletchwood Road - Solar Farm12 MW
- Bryngolwg Farm, Hirwaun - Solar farm8.94 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.