Power plant · East Riding of Yorkshire, England, United Kingdom

Newton Farm, Tongue Lane - Solar Farm & Battery Storage

Newton Farm, Tongue Lane - Solar Farm & Battery Storage is a permitted power plant in East Riding of Yorkshire, England, United Kingdom, with 1.5 MW of capacity, operated by Newstead Farm.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Riding of Yorkshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNorth West Of Newton Farm Tongue Lane Gilberdyke, HU15 2UYDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date11 Jun 2025 (permit 24/02946/PLF, Town and Country Planning Act, issued by East Riding of Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date19 Dec 2024 (reference 24/02946/PLF, planning authority East Riding of Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date11 Jun 2025 (granted, reference 24/02946/PLF, planning authority East Riding of Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNewstead FarmDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area1.21 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.7467, -0.7123DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Newton Farm, Tongue Lane - Solar Farm & Battery Storage is the 1,935th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,924th-largest of 3,222 in the United Kingdom by capacity; its 1.5 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,935th of 2,174186,088 MW<0.1%
United Kingdom2,924th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data6,143rd of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 415 grid connections (202 operating, 2,793 MW), 191 substations, 3 transmission lines, 3 data centers and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar 4 MW grid connection at Ellifoot LaneGrid connection4 MWPlanned1.8 km
Newport 1Substation——2.4 km
Newport 2Substation——2.4 km
Newport Building grid connectionGrid connection1.1 MWPlanned3.9 km
Newport Building grid connectionGrid connection1.4 MWPlanned3.9 km
Holme Upon Spalding MoorSubstation——8.2 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled20 km
North Humber to High MarnhamTransmission line—Planned34 km
ThalesData center——38 km