Power plant · Northumberland, England, United Kingdom

Land South East Of Water Treatment Works Bridge End

Land South East Of Water Treatment Works Bridge End is a power plant in Northumberland, England, United Kingdom, with 1.5 MW of capacity, operated by DJ and SJ Recycling.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorthumberland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressHexhamDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date10 Apr 2013 (permit 12/03802/RENE, Town and Country Planning Act, issued by Northumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date31 Dec 2012 (reference 12/03802/RENE, planning authority Northumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date10 Apr 2013 (granted, reference 12/03802/RENE, planning authority Northumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorDJ and SJ RecyclingDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyAnaerobic DigestionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.9745, -2.0788DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Northumberland, reference 12/03802/RENE)
  3. Permit applied for (planning authority Northumberland, reference 12/03802/RENE)

How it compares

Land South East Of Water Treatment Works Bridge End is the 3,498th-largest of 3,953 power plants in England and the 5,114th-largest of 5,723 in the United Kingdom by capacity; its 1.5 MW is <0.1% of the 136,106 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,498th of 3,95385,679 MW<0.1%
United Kingdom5,114th of 5,723136,106 MW<0.1%
All power plants in our data11,667th of 12,7051,210,931 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 184 grid connections (88 operating, 1,074 MW), 126 substations, 1 data center and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Biomass 2.5 MW grid connection at HexhamGrid connection2.5 MWOperating0.8 km
HexhamSubstation——1.0 km
Oil 1.36 MW grid connection at Fourstones 20kV DirectGrid connection1.36 MWOperating1.0 km
Battery storage and Solar 80 MW grid connection at Fourstones HybridGrid connection80 MWPlanned6.6 km
Fourstones 20kVSubstation——6.9 km
Fourstones 33kVSubstation——6.9 km
Stellium Newcastle CampusData center——37 km
Cross Border Connection (England)Transmission line—Planned49 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page