Power plant · Hartlepool, England, United Kingdom
Land at Bluehouse Farm
Land at Bluehouse Farm is a power plant in Hartlepool, England, United Kingdom, with 5 MW of capacity, operated by Anesco.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Hartlepool (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land at Bluehouse Farm, Stockton Road, Newton Bewley, Billingham, TS22 5PH | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2016 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 30 Nov 2015 (permit H/2015/0316, Town and Country Planning Act, issued by Hartlepool) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 9 Sept 2015 (ref. H/2015/0316, Hartlepool) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 30 Nov 2015 (granted, ref. H/2015/0316, Hartlepool) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Anesco | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 11.1 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 54.6337, -1.2652 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Land at Bluehouse Farm is the 1,758th-largest of 3,430 power plants in England and the 2,742nd-largest of 5,050 in the United Kingdom by capacity; its 5 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,758th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 2,742nd of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 8,356th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act), no. H/2015/0316
- Started operating
Nearby
Within 50 km of this power plant: 258 grid connections (130 operating, 1,270 MW) and 159 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Waste 2.185 MW grid connection at North Tees T3 T4 | Grid connection | 2.19 MW | Operating | 1.9 km |
| Gas 6.745 MW grid connection at Greatham Direct | Grid connection | 6.75 MW | Operating | 2.0 km |
| Battery storage and Solar 99 MW grid connection at Greatham Hybrid | Grid connection | 99 MW | Planned | 2.0 km |
| Billingham Marsh House | Substation | — | — | 2.3 km |
| Wynyard | Substation | — | — | 3.4 km |
| Saltholme | Substation | — | — | 3.6 km |
Operator and place
More from Anesco
- Persley BESS - Battery Storage70.1 MW · permitted
- Newton Wood Farm49.9 MW · permitted
- Brown Edge - Battery Storage49.5 MW · permitted
- Blackpark House - Battery Storage30 MW · permitted
- Drayton Manor Farm25 MW
- Addison Road22 MW
- Frome Valley - Solar Farm20.6 MW · permitted
- Battery 20 MW (REPD 6907)20 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.