Power plant · Aberdeenshire, Scotland, United Kingdom
Rothienorman - Battery Storage
Rothienorman - Battery Storage is a cancelled power plant in Aberdeenshire, Scotland, United Kingdom, with 49.9 MW of capacity, operated by Anesco.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Aberdeenshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | 1.5km To The North West Of Rothienorman, AB51 8GL | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (planning permission granted, permission expired) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 14 Nov 2022 (permit APP/2022/1218, Town and Country Planning Act, issued by Aberdeenshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 9 Jun 2022 (reference APP/2022/1218, planning authority Aberdeenshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 14 Nov 2022 (granted, reference APP/2022/1218, planning authority Aberdeenshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Anesco (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 49.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 57.4163, -2.4631 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Aberdeenshire, reference APP/2022/1218)
- Permit applied for (planning authority Aberdeenshire, reference APP/2022/1218)
How it compares
Rothienorman - Battery Storage is the 182nd-largest of 1,326 power plants in Scotland and the 447th-largest of 5,723 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 136,106 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 182nd of 1,326 | 40,645 MW | 0.12% |
| United Kingdom | 447th of 5,723 | 136,106 MW | <0.1% |
| All power plants in our data | 1,950th of 12,705 | 1,210,931 MW | <0.1% |
Nearby
Within 50 km of this power plant: 143 grid connections (62 operating, 409 MW), 86 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Wind 4.526 MW grid connection at Braco West Grid | Grid connection | 4.53 MW | Operating | 1.5 km |
| Rothie 3 BESS grid connection | Grid connection | 75 MW | Planned | 2.2 km |
| Rothienorman Battery Storage grid connection | Grid connection | 50 MW | Planned | 2.2 km |
| Rothienorman GSP | Substation | — | — | 3.2 km |
| Fyvie Primary | Substation | — | — | 4.7 km |
| Insch Primary | Substation | — | — | 12 km |
| Brightsolid | Data center | — | — | 35 km |
Operator and place
Grid connections attached to this power plant
More from Anesco
- Persley BESS - Battery Storage70.1 MW · permitted
- Marston Sewerage Pumping Station, Bodymoor Heath Lane - Battery Storage50 MW · planned
- Newton Wood Farm49.9 MW
- Turf Carr Solar Farm49.9 MW · permitted
- Overton Grange, Overton Road - Solar Farm Battery Energy Storage49.9 MW · planned
- Low Farm Solar Farm49.9 MW · under construction
- Brentwood nergy Storage System49.9 MW
- Brown Edge - Battery Storage49.5 MW · permitted
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Auchentiber Road - Battery Energy Storage System700 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Braston New Energy500 MW
- Gretna Green Battery Storage456 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.