Power plant · Wakefield, England, United Kingdom

Headways, Unit 3 - Solar Panels

Headways, Unit 3 - Solar Panels is a permitted power plant in Wakefield, England, United Kingdom, with 1 MW of capacity, operated by Harvest Green Developments.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWakefield (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressUnit 3, Headways, Stanley, Wakefield, WF3 4FEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date21 Oct 2024 (permit 24/01632/SPN, Town and Country Planning Act, issued by Wakefield)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date20 Sept 2024 (ref. 24/01632/SPN, Wakefield)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date21 Oct 2024 (granted, ref. 24/01632/SPN, Wakefield)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorHarvest Green DevelopmentsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.7220, -1.4462DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Headways, Unit 3 - Solar Panels is the 2,080th-largest of 2,174 power plants planned, permitted or under construction in England and the 3,100th-largest of 3,222 in the United Kingdom by capacity; its 1 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England2,080th of 2,174186,088 MW<0.1%
United Kingdom3,100th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data6,333rd of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 449 grid connections (220 operating, 2,367 MW), 368 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Solar 2.09 MW grid connection at Royds LaneGrid connection2.09 MWPlanned0.1 km
Solar 4 MW grid connection at Wellington StreetGrid connection4 MWOperating0.6 km
Waste 2.945 MW grid connection at Royds LaneGrid connection2.95 MWOperating0.6 km
NormantonSubstation——3.2 km
Royds LaneSubstation——3.3 km
Wakefield NorthSubstation——3.9 km
Yorkshire GREENTransmission line—Permitted23 km
North Humber to High MarnhamTransmission line—Planned48 km

Operator and place

More from Harvest Green Developments

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page