Power plant · North Northamptonshire, England, United Kingdom

Curver Way - Solar Panels

Curver Way - Solar Panels is a permitted power plant in North Northamptonshire, England, United Kingdom, with 1 MW of capacity, operated by Harvest Green Developments.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Northamptonshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressCurver Way, Corby, NN17 5XNDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date1 Nov 2024 (permit NC/24/00299/PASOLA, Town and Country Planning Act, issued by North Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date19 Sept 2024 (reference NC/24/00299/PASOLA, planning authority North Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date1 Nov 2024 (granted, reference NC/24/00299/PASOLA, planning authority North Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorHarvest Green Developments (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.5019, -0.6587DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority North Northamptonshire, reference NC/24/00299/PASOLA)
  2. Permit applied for (planning authority North Northamptonshire, reference NC/24/00299/PASOLA)

How it compares

Curver Way - Solar Panels is the 1,581st-largest of 1,651 power plants planned, permitted or under construction in England and the 2,458th-largest of 2,549 in the United Kingdom by capacity; its 1 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,581st of 1,651172,174 MW<0.1%
United Kingdom2,458th of 2,549279,978 MW<0.1%
All power plants planned, permitted or under construction in our data5,691st of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
The Horizon CentreData center——1.8 km
Data center, England (OSM way 87850427)Data center——27 km
Hellermann Tyton DataData center——35 km
Weston Marsh to East LeicestershireTransmission line—Planned38 km

Operator and place

More from Harvest Green Developments

Other power plants in England

All 5809 power plants in England, United Kingdom