Power plant · Northumberland, England, United Kingdom

Halfway House, Lincoln Hill - Solar Array

Halfway House, Lincoln Hill - Solar Array is a cancelled power plant in Northumberland, England, United Kingdom, with 1 MW of capacity, operated by Humshaugh Net Zero.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorthumberland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressE/O Halfway House, Lincoln Hill, Humshaugh, NE46 4BEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date14 Jul 2023 (permit 22/03978/FUL, Town and Country Planning Act, issued by Northumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date5 Dec 2022 (reference 22/03978/FUL, planning authority Northumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date14 Jul 2023 (granted, reference 22/03978/FUL, planning authority Northumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorHumshaugh Net Zero (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area0.98 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.0365, -2.1399DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Northumberland, reference 22/03978/FUL)
  2. Permit applied for (planning authority Northumberland, reference 22/03978/FUL)

How it compares

Halfway House, Lincoln Hill - Solar Array is the 3,800th-largest of 3,953 power plants in England and the 5,508th-largest of 5,723 in the United Kingdom by capacity; its 1 MW is <0.1% of the 136,106 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,800th of 3,95385,679 MW<0.1%
United Kingdom5,508th of 5,723136,106 MW<0.1%
All power plants in our data12,456th of 12,7051,210,931 MW<0.1%

Nearby

Within 50 km of this power plant: 146 grid connections (74 operating, 964 MW), 116 substations, 1 data center and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage and Solar 80 MW grid connection at Fourstones HybridGrid connection80 MWPlanned1.9 km
Fourstones 20kVSubstation——3.2 km
Fourstones 33kVSubstation——3.2 km
Battery storage and Solar 112 MW grid connection at Carr Edge Farm BESSGrid connection112 MWPlanned3.6 km
Biomass 2.5 MW grid connection at HexhamGrid connection2.5 MWOperating7.2 km
HexhamSubstation——7.2 km
Stellium Newcastle CampusData center——41 km
Cross Border Connection (England)Transmission line—Planned43 km

Operator and place

More from Humshaugh Net Zero

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page