Power plant · North Northamptonshire, England, United Kingdom
Grendon Lakes, Grendon - Battery Storage Facility
Grendon Lakes, Grendon - Battery Storage Facility is a permitted power plant in North Northamptonshire, England, United Kingdom, with 50 MW of capacity, operated by Statera Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Northamptonshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Grendon Lakes, Main Road, Grendon, Northampton, NN7 1JW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 29 Jul 2025 (permit NW/23/00360/FUL, Town and Country Planning Act, issued by North Northamptonshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 29 Jun 2023 (reference NW/23/00360/FUL, planning authority North Northamptonshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 29 Jul 2025 (granted, reference NW/23/00360/FUL, planning authority North Northamptonshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Statera Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 50 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.2446, -0.7197 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority North Northamptonshire, reference NW/23/00360/FUL)
- Permit applied for (planning authority North Northamptonshire, reference NW/23/00360/FUL)
How it compares
Grendon Lakes, Grendon - Battery Storage Facility is the 478th-largest of 2,174 power plants planned, permitted or under construction in England and the 847th-largest of 3,222 in the United Kingdom by capacity; its 50 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 478th of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 847th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,927th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 10 data centers, 10 grid connections (4 operating, 32.5 MW) and 5 substations, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Hellermann Tyton Data | Data center | — | — | 14 km |
| Pulsant Milton Keynes SE-1 | Data center | — | — | 21 km |
| Data center, England (OSM way 460010263) | Data center | — | — | 21 km |
| East Claydon GSP | Substation | — | — | 38 km |
| Shelswell Solar Park grid connection | Grid connection | 4.75 MW | Operating | 41 km |
| Cottisford Primary | Substation | — | — | 42 km |
| Pembridge Farm grid connection | Grid connection | 131 MW | Planned | 42 km |
| Launton - Battery grid connection | Grid connection | 40 MW | Planned | 45 km |
| Bicester North BSP | Substation | — | — | 47 km |
Operator and place
More from Statera Energy
- The Kintore Hydrogen Project, Kintore - Hydrogen Plant3,000 MW · permitted
- Carrington Power Station, Manchester Road - Battery Storage680 MW · under construction
- Loch Ness & Loch Kemp - Pumped Hydro Scheme600 MW · planned
- Culham Science Centre, Clifton Hampden - Battery Storage Facility500 MW · permitted
- East Claydon Battery Energy Storage500 MW · permitted
- Sundon, Chalton - Battery Energy Storage System500 MW · permitted
- East Chickerell Court Farm - Battery Energy Storage System400 MW · permitted
- Dollymans Storage100 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.