Power plant · South Holland, England, United Kingdom

Fendyke Farm - Battery Energy Storage

Fendyke Farm - Battery Energy Storage is a cancelled battery storage plant in South Holland, England, United Kingdom, with 10 MW of capacity, operated by Integrum SPV 21014 Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth Holland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressFendyke Farm, Off Old Fendyke, Sutton St James, Spalding, PE12 0LXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date2 Dec 2024 (reference H20-1007-24, planning authority South Holland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date13 May 2025 (refused, reference H20-1007-24, planning authority South Holland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorIntegrum SPV 21014 Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity10 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.7354, 0.0271DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority South Holland, reference H20-1007-24)
  2. Permit applied for (planning authority South Holland, reference H20-1007-24)

How it compares

Fendyke Farm - Battery Energy Storage is the 1,468th-largest of 4,035 power plants in England and the 2,324th-largest of 5,834 in the United Kingdom by capacity; its 10 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,468th of 4,035134,434 MW<0.1%
United Kingdom2,324th of 5,834200,500 MW<0.1%
All power plants in our data10,476th of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 3 data centers and 3 transmission lines, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Positive ParkData center——17 km
Kings Lynn B Connection ProjectTransmission line—Permitted23 km
Longmarsh Green EnergyData center—Planned24 km
Eastern Green Link 3 and Eastern Green Link 4Transmission line—Planned27 km
Triton Knoll Electrical SystemTransmission line—Permitted27 km
Data center, England (OSM way 87850427)Data center——28 km

Operator and place

More from Integrum SPV 21014 Limited

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page