Grid connection · England, United Kingdom

Wryde Croft Wind Farm grid connection

Wryde Croft Wind Farm grid connection is a grid connection in England, United Kingdom, with 26 MW of capacity, held by Wryde Croft Wind Farm Limited.

Map: where Wryde Croft Wind Farm grid connection lies
52.6637, -0.0314 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Walpole)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderWryde Croft Wind Farm LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toWryde Croft (matched by name+coordinates+technology+capacity, 2.33 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity26 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyWindUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date10 Jan 2016UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.6637, -0.0314UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Wryde Croft
  2. Permit granted: Wryde Croft (appeal granted, planning authority Peterborough, reference 07/01411/FUL)
  3. Permit granted: Wryde Croft (planning authority Peterborough, reference 07/01411/FUL)
  4. Permit refused: Wryde Croft (planning authority Peterborough, reference 07/01411/FUL)
  5. Permit applied for: Wryde Croft (planning authority Peterborough, reference 07/01411/FUL)

How it compares

Wryde Croft Wind Farm grid connection is the 1,175th-largest of 3,539 grid connections in England and the 1,701st-largest of 4,870 in the United Kingdom by capacity; its 26 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,175th of 3,539341,715 MW<0.1%
United Kingdom1,701st of 4,870467,981 MW<0.1%
All grid connections in our data5,043rd of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 326 power plants (121 operating, 3,882 MW), 67 substations, 6 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Malice Farm, French Drove - BESSPower plant49.9 MWPermitted0.2 km
Malice Farm, French Drove - Solar FarmPower plant49.9 MWPermitted0.2 km
Nutsgrove Farm, Thorney - Battery Energy StoragePower plant50 MWPermitted2.1 km
Guyhirn Primary 11kVSubstation——8.9 km
Positive ParkData center——11 km
Leverington Primary 11kVSubstation——12 km
Wisbech Railway Primary 11kVSubstation——13 km
Data center, England (OSM way 87850427)Data center——20 km
Kings Lynn B Connection ProjectTransmission line—Permitted28 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page