Power plant · West Northamptonshire, England, United Kingdom
Fawsley Estate, Fawsley - Solar Arrays
Fawsley Estate, Fawsley - Solar Arrays is a permitted power plant in West Northamptonshire, England, United Kingdom, with 12 MW of capacity, operated by Elgin Energy EsCo.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | West Northamptonshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Fawsley Estate, Fawsley, NN11 3BA | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 24 Jan 2024 (permit WND/2022/0901, Town and Country Planning Act, issued by West Northamptonshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 4 Nov 2022 (reference WND/2022/0901, planning authority West Northamptonshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 24 Jan 2024 (granted, reference WND/2022/0901, planning authority West Northamptonshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Elgin Energy EsCo | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 12 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 24.2 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.2071, -1.1779 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Fawsley Estate, Fawsley - Solar Arrays is the 1,412th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,193rd-largest of 3,222 in the United Kingdom by capacity; its 12 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,412th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 2,193rd of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 4,951st of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 308 grid connections (17 operating, 145 MW), 21 substations and 10 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Fawsley Estate Solar Farm grid connection | Grid connection | — | — | 2.2 km |
| Daventry Wind Farm grid connection | Grid connection | — | — | 5.1 km |
| Newnham Grange Solar Farm grid connection | Grid connection | — | — | 5.9 km |
| Hellermann Tyton Data | Data center | — | — | 18 km |
| Cottisford Primary | Substation | — | — | 26 km |
| Deddington Primary | Substation | — | — | 28 km |
| nLighten Milton Keynes | Data center | — | — | 31 km |
| Upper Heyford Primary | Substation | — | — | 32 km |
| Data center, England (OSM way 460010263) | Data center | — | — | 33 km |
Operator and place
More from Elgin Energy EsCo
- Pashley Farm, Ninfield Road - Battery Energy Storage System130 MW · planned
- Pool Hall Farm, Lower Penn - Battery Storage100 MW · permitted
- Pelham Road, Upton Magna - Battery Energy Storage System100 MW · planned
- Lime Lane, Pelsall - Battery Energy Storage System100 MW
- Catsfield Christmas Tree Farm, The Stream - Battery Energy Storage System99.9 MW · planned
- Highfields Farm, Clifton Lane - Solar Panels61.9 MW · under construction
- Moat Farm - Solar Farm49.9 MW · permitted
- Woodlands Farm - Solar Array49.9 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.