Power plant · Cannock Chase, England, United Kingdom

Lime Lane, Pelsall - Battery Energy Storage System

Lime Lane, Pelsall - Battery Energy Storage System is a cancelled battery storage plant in Cannock Chase, England, United Kingdom, with 100 MW of capacity, operated by Elgin Energy EsCo.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCannock Chase (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressThe rear of the Bungalow, Lime Lane, Pelsall, WS3 5ALDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date23 Jul 2025 (reference CH/25/0225, planning authority Cannock Chase)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date28 May 2026 (refused, reference CH/25/0225, planning authority Cannock Chase)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorElgin Energy EsCo (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity100 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.6588, -1.9709DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Cannock Chase, reference CH/25/0225)
  2. Permit applied for (planning authority Cannock Chase, reference CH/25/0225)

How it compares

Lime Lane, Pelsall - Battery Energy Storage System is the 139th-largest of 4,035 power plants in England and the 226th-largest of 5,834 in the United Kingdom by capacity; its 100 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England139th of 4,035134,434 MW<0.1%
United Kingdom226th of 5,834200,500 MW<0.1%
All power plants in our data2,552nd of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
Hutchison 3GData center——13 km
EE Data CentreData center——15 km
Evoque Data Center SolutionsData center——39 km

Operator and place

More from Elgin Energy EsCo

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page