Power plant · Blaby, England, United Kingdom
Desford Road, Thurlaston
Desford Road, Thurlaston is a permitted power plant in Blaby, England, United Kingdom, with 40 MW of capacity, operated by Elgin Energy EsCo.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Blaby (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Field No 8236, Hinckley Road, Land To South And West Of, Desford Road, Thurlaston, Leicester, LE9 7TD | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 17 Sept 2018 (permit 18/0242/FUL, Town and Country Planning Act, issued by Blaby) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 27 Mar 2018 (reference 18/0242/FUL, planning authority Blaby) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 17 Sept 2018 (granted, reference 18/0242/FUL, planning authority Blaby) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Elgin Energy EsCo | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 40 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 80.2 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.6043, -1.2414 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Desford Road, Thurlaston is the 836th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,342nd-largest of 3,222 in the United Kingdom by capacity; its 40 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 836th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 1,342nd of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,556th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 376 grid connections, 7 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Desford Road BESS grid connection | Grid connection | — | — | 1.5 km |
| Next Enderby grid connection | Grid connection | — | — | 1.7 km |
| Greens Lodge Farm, Huncote Engine No 2 grid connection | Grid connection | — | — | 2.6 km |
| Santander data center, England | Data center | — | — | 3.2 km |
| Santander data center, England | Data center | — | — | 3.5 km |
| Data center, England (OSM way 710050084) | Data center | — | — | 12 km |
| Weston Marsh to East Leicestershire | Transmission line | — | Planned | 29 km |
| Chesterfield to Willington | Transmission line | — | Planned | 49 km |
Operator and place
More from Elgin Energy EsCo
- Pashley Farm, Ninfield Road - Battery Energy Storage System130 MW · planned
- Pool Hall Farm, Lower Penn - Battery Storage100 MW · permitted
- Pelham Road, Upton Magna - Battery Energy Storage System100 MW · planned
- Lime Lane, Pelsall - Battery Energy Storage System100 MW
- Catsfield Christmas Tree Farm, The Stream - Battery Energy Storage System99.9 MW · planned
- Highfields Farm, Clifton Lane - Solar Panels61.9 MW · under construction
- Moat Farm - Solar Farm49.9 MW · permitted
- Woodlands Farm - Solar Array49.9 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.