Power plant · Buckinghamshire, England, United Kingdom
Derehams Farm, Derehams Lane - Battery Storage
Derehams Farm, Derehams Lane - Battery Storage is a planned battery storage plant in Buckinghamshire, England, United Kingdom, with 126 MW of capacity, operated by Newton Energi Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Buckinghamshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Derehams Farm Derehams Lane Loudwater, HP10 9RR | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 15 Nov 2023 (reference 23/07053/FUL, planning authority Buckinghamshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Newton Energi Limited (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 126 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.6118, -0.6909 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit applied for (planning authority Buckinghamshire, reference 23/07053/FUL)
How it compares
Derehams Farm, Derehams Lane - Battery Storage is the 223rd-largest of 1,650 power plants planned, permitted or under construction in England and the 364th-largest of 2,548 in the United Kingdom by capacity; its 126 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 223rd of 1,650 | 171,264 MW | <0.1% |
| United Kingdom | 364th of 2,548 | 279,068 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,147th of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 219 substations, 159 grid connections (76 operating, 885 MW), 150 data centers (1 operating, 88 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Loudwater BSP | Substation | — | — | 0.1 km |
| Derehams Farm grid connection | Grid connection | 100 MW | Planned | 0.2 km |
| Loudwater grid connection | Grid connection | 40 MW | Operating | 0.2 km |
| Flackwell Heath Primary | Substation | — | — | 1.8 km |
| Wycombe Marsh Primary | Substation | — | — | 2.3 km |
| Waste 1.33 MW grid connection at Flackwell Heath | Grid connection | 1.33 MW | Operating | 2.7 km |
| CapitaLand Ascendas REIT data center, High Wycombe | Data center | — | — | 6.2 km |
| SDC M40 Campus | Data center | — | Planned | 7.2 km |
| Spectrum House | Data center | — | — | 9.5 km |
Operator and place
More from Newton Energi Limited
- Springfield Farm, Hensall - Battery Energy Storage Facility240 MW · permitted
- Springfield Farm, Weeland Road - Battery Energy Storage Facility240 MW · permitted
- Kellingley Farm, Stocking Lane - Battery Energy Storage240 MW · planned
- Corner Of Weeland Road, Lunn Lane - Battery Storage Facility200 MW · permitted
- Fordtead Lane, Thorpe Marsh - Battery Energy Facility180 MW · permitted
- Moat Lane, Wickersley - Battery Storage Facility100 MW · permitted
- Winterton Road - Battery Energy Storage95 MW
- Green Lane, Thurcroft - Battery Energy Storage Facility85 MW
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- Wikidata. Wikidata, CC0 1.0.