Green Lane, Thurcroft - Battery Energy Storage Facility
Green Lane, Thurcroft - Battery Energy Storage Facility is a permitted power plant in Rotherham, England, United Kingdom, with 85 MW of capacity, operated by Newton Energi Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Rotherham (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Green Lane, Thurcroft, Rotherham, S66 9JD | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 12 May 2023 (permit RB2022/1767, Town and Country Planning Act, issued by Rotherham) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 25 Nov 2022 (ref. RB2022/1767, Rotherham) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 12 May 2023 (granted, ref. RB2022/1767, Rotherham) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Newton Energi Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 85 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.4034, -1.2660 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Green Lane, Thurcroft - Battery Energy Storage Facility is the 345th-largest of 2,174 power plants planned, permitted or under construction in England and the 571st-largest of 3,222 in the United Kingdom by capacity; its 85 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 345th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 571st of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,502nd of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 507 grid connections (188 operating, 2,059 MW), 268 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Battery storage 49.9 MW grid connection at Green Lane BESS | Grid connection | 49.9 MW | Planned | 0.1 km |
| Battery storage 85 MW grid connection at NEL Green BESS | Grid connection | 85 MW | Planned | 0.1 km |
| Thurcroft | Substation | — | — | 0.2 km |
| Battery storage 49.9 MW grid connection at Green Lane BESS | Grid connection | 49.9 MW | Operating | 0.2 km |
| New Orchard Lane | Substation | — | — | 0.8 km |
| Silverwood | Substation | — | — | 4.2 km |
| North Humber to High Marnham | Transmission line | — | Planned | 27 km |
| Chesterfield to Willington | Transmission line | — | Planned | 43 km |
Operator and place
More from Newton Energi Limited
- Springfield Farm, Hensall - Battery Energy Storage Facility240 MW · permitted
- Springfield Farm, Weeland Road - Battery Energy Storage Facility240 MW · permitted
- Kellingley Farm, Stocking Lane - Battery Energy Storage240 MW · planned
- Corner Of Weeland Road, Lunn Lane - Battery Storage Facility200 MW · permitted
- Fordtead Lane, Thorpe Marsh - Battery Energy Facility180 MW · permitted
- Derehams Farm, Derehams Lane - Battery Storage126 MW · planned
- Moat Lane, Wickersley - Battery Storage Facility100 MW · permitted
- Winterton Road - Battery Energy Storage95 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.