Power plant · North Kesteven, England, United Kingdom

Ermine Street Farm solar park

Ermine Street Farm solar park is a power plant in North Kesteven, England, United Kingdom, with 32.5 MW of capacity, operated by Octopus Investments.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Kesteven (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand At Ermine Street Farm Ermine Street Ancaster Heath Grantham Lincolnshire, NG32 3RNDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2014DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date6 Dec 2013 (permit 13/0929/FUL, Town and Country Planning Act, issued by North Kesteven)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date20 Aug 2013 (reference 13/0929/FUL, planning authority North Kesteven)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date6 Dec 2013 (granted, reference 13/0929/FUL, planning authority North Kesteven)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorOctopus InvestmentsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity32.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area67.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.0159, -0.5182DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Ermine Street Farm solar park is the 369th-largest of 3,430 power plants in England and the 695th-largest of 5,050 in the United Kingdom by capacity; its 32.5 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England369th of 3,43071,985 MW<0.1%
United Kingdom695th of 5,050115,642 MW<0.1%
All power plants in our data2,649th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 13/0929/FUL
  2. Started operating

Nearby

Within 50 km of this power plant: 12 grid connections (10 operating, 25.8 MW), 8 substations, 3 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Digital Space DC - NewarkData center——20 km
Triton Knoll Electrical SystemTransmission line—Permitted22 km
Eastern Green Link 3 and Eastern Green Link 4Transmission line—Planned29 km
Hall Water Treatment Works grid connectionGrid connection1.6 MWOperating31 km
Newton on Trent Water Works grid connectionGrid connection3.1 MWOperating32 km
StowSubstation——36 km
Stow Park Road grid connectionGrid connection1.19 MWOperating36 km
Weston Marsh to East LeicestershireTransmission line—Planned38 km
NormanbySubstation——41 km

Operator and place

More from Octopus Investments

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page