Power plant · Wiltshire, England, United Kingdom

Forest Gate - Solar Farm & Battery Storage

Forest Gate - Solar Farm & Battery Storage is a cancelled solar power plant in Wiltshire, England, United Kingdom, with 49.9 MW of capacity, operated by Eden Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWiltshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressForest Gate, Pewsham, Chippenham, SN15 3RSDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date10 Mar 2023 (permit PL/2021/06112, Town and Country Planning Act, issued by Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date11 Jun 2021 (reference PL/2021/06112, planning authority Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date10 Mar 2023 (granted, reference PL/2021/06112, planning authority Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEden Renewables (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area82.3 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.4433, -2.0740DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Wiltshire, reference PL/2021/06112)
  2. Permit applied for (planning authority Wiltshire, reference PL/2021/06112)

How it compares

Forest Gate - Solar Farm & Battery Storage is the 305th-largest of 4,035 power plants in England and the 538th-largest of 5,834 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England305th of 4,035134,434 MW<0.1%
United Kingdom538th of 5,834200,500 MW<0.1%
All power plants in our data3,762nd of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 179 grid connections (108 operating, 1,213 MW), 105 substations, 7 data centers and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Forest Gate - PV grid connectionGrid connection40.3 MWPlanned0.2 km
Cocklebury PrimarySubstation——3.4 km
Chippenham BSPSubstation——3.5 km
Chippenham Project grid connectionGrid connection11.4 MWOperating3.6 km
Rowden PrimarySubstation——4.3 km
Calne Power Generation Plant grid connectionGrid connection7.13 MWOperating5.4 km
Ark Data CentresData center——10 km
Data center, England (OSM way 996865179)Data center——10 km
VodafoneData center——20 km

Operator and place

Grid connections attached to this power plant

More from Eden Renewables

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page