Power plant · Basildon, England, United Kingdom

Cleanaway Project 3

Cleanaway Project 3 is a permitted power plant in Basildon, England, United Kingdom, with 27.8 MW of capacity, operated by Veolia.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBasildon (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressPitsea Hall Lane, Pitsea, Basildon, Essex, SS16 4UHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (no application required)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorVeoliaDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity27.8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyEfW IncinerationDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5374, 0.5123DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Cleanaway Project 3 is the 1,086th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,710th-largest of 3,222 in the United Kingdom by capacity; its 27.8 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,086th of 2,174186,088 MW<0.1%
United Kingdom1,710th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data3,244th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 55 data centers (1 operating, 88 MW), 2 grid connections (1 operating, 6.94 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Imperium 315Data center——5.8 km
CityFibre CabinetsData center——9.9 km
Fujitsu Data CentreData center——18 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating31 km
North London (Electricity Line) ReinforcementTransmission line—Permitted39 km
Tertiary Study grid connectionGrid connection57 MWPlanned42 km

Operator and place

More from Veolia

Other power plants in England

All 5809 power plants in England, United Kingdom