Coryton Grid 33kV Substation is a 33 kV primary substation in England, United Kingdom, with 38.1 MVA of demand headroom and 1.1 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Coryton Grid 33kV lies
51.5179, 0.5045 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom38.1 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom1.1 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity49.2 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.5179, 0.5045UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 360 power plants (149 operating, 8,385 MW), 349 grid connections (249 operating, 2,809 MW), 55 data centers (1 operating, 88 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Coryton Energy Company LtdPower plant800 MWOperating0.6 km
(ANM) SS17 9LL The Manorway grid connectionGrid connection20 MWPlanned0.8 km
Land adjacent to the former Coryton RefineryPower plant5 MWCancelled0.9 km
Gateway Energy Centre - Battery Energy StoragePower plant450 MWPermitted0.9 km
Pitsea Landfill grid connectionGrid connection21 MWOperating2.4 km
Kings Road grid connectionGrid connection2 MWOperating3.4 km
Imperium 315Data center——7.8 km
CityFibre CabinetsData center——11 km
Fujitsu Data CentreData center——17 km

Grid operator and place