Fieldes Lock EfW Power Station is a cancelled power plant in Epping Forest, England, United Kingdom, with 33.5 MW of capacity, operated by Veolia Environnement Sa.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEpping Forest (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressRye House, Hoddesdon, Broxbourne, EN11 0RFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (secretary of state, refusal)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date18 Jan 2017 (reference 7/0067-17, planning authority Broxbourne)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Jul 2019 (refused, reference 7/0067-17, planning authority Broxbourne)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Jul 2019 (secretary of state refused, reference 7/0067-17, planning authority Broxbourne)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorVeolia Environnement Sa (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity33.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyEfW IncinerationDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.7646, 0.0153DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Broxbourne, reference 7/0067-17)
  2. Permit refused (secretary of state refused, planning authority Broxbourne, reference 7/0067-17)
  3. Permit applied for (planning authority Broxbourne, reference 7/0067-17)

How it compares

Fieldes Lock EfW is the 620th-largest of 4,035 power plants in England and the 1,026th-largest of 5,834 in the United Kingdom by capacity; its 33.5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England620th of 4,035134,434 MW<0.1%
United Kingdom1,026th of 5,834200,500 MW<0.1%
All power plants in our data4,987th of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 98 data centers (1 operating, 88 MW), 59 substations, 23 grid connections (13 operating, 103 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Kao Data KLON-01Data center——7.9 km
Kao Data KLON-02Data center——7.9 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating8.0 km
Google Datacentre Waltham CrossData center——8.8 km
North London (Electricity Line) ReinforcementTransmission line—Permitted18 km
Tertiary Study grid connectionGrid connection57 MWPlanned28 km
Willesden GSPSubstation——32 km
Canal Bank 11kV PrimarySubstation——32 km
Canal Bank 6.6kV PrimarySubstation——32 km

Operator and place

More from Veolia Environnement Sa