Power plant · Havering, England, United Kingdom

Clay Tye Farm - Energy Storage Facility

Clay Tye Farm - Energy Storage Facility is a planned power plant in Havering, England, United Kingdom, with 200 MW of capacity, operated by London & Essex Energy Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHavering (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressClay Tye Farm, Upminster, RM14 3PLDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date21 May 2026 (reference P0634.26, planning authority Havering)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLondon & Essex Energy LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity200 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5521, 0.2977DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Havering, reference P0634.26)

How it compares

Clay Tye Farm - Energy Storage Facility is the 177th-largest of 2,174 power plants planned, permitted or under construction in England and the 279th-largest of 3,222 in the United Kingdom by capacity; its 200 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England177th of 2,174185,888 MW0.11%
United Kingdom279th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data741st of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 82 data centers (1 operating, 88 MW), 31 substations, 4 grid connections (2 operating, 9.14 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Fujitsu Data CentreData center——8.1 km
NTT London 1Data center——8.4 km
OVH data center, EnglandData center——11 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating17 km
North London (Electricity Line) ReinforcementTransmission line—Permitted25 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating27 km
Tertiary Study grid connectionGrid connection57 MWPlanned27 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating36 km
Volt Avenue PrimarySubstation——38 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page