Grid connection · England, United Kingdom

Tertiary Study grid connection

Tertiary Study grid connection is a planned grid connection in England, United Kingdom, with 57 MW of capacity, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceTERTIARY STUDY grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connection site: BASINGSTOKE)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (ACCEPTED TO CONNECT)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toBramley (Basi) GSP (via: gsp)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity57 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date13 Jul 2026SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date13 Jul 2027 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage132 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.5200, -0.0896SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Tertiary Study grid connection is the 521st-largest of 2,678 grid connections in England and the 762nd-largest of 4,493 in the United Kingdom by capacity; its 57 MW is <0.1% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England521st of 2,678322,469 MW<0.1%
United Kingdom762nd of 4,493459,551 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 100 substations, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
Goldsmiths PrimarySubstation——12 km
Volt Avenue PrimarySubstation——12 km
Wesley Avenue PrimarySubstation——12 km

Grid operator and place

More from Southern Electric Power Distribution plc

Other grid connections in England

All 3977 grid connections in England, United Kingdom

Data on this page