Data center · England, United Kingdom

NTT London 1

NTT London 1 is a data center in England, United Kingdom, operated by NTT Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
OperatorNTT LimitedOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Websitehttps://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/emea/london-1-data-centerOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Building footprint13,487 m² (building)OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Coordinates51.5474, 0.1758OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026

Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.

Request research

How its operator compares

NTT Limited operates 6 of the 191 data centers in the United Kingdom in our data with a named owner; 4 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in United KingdomRankData centersShare
Equinix, Inc.1st136.8%
Digital Realty2nd105.2%
Virtus2nd105.2%
Pulsant4th84.2%
NTT Limited5th63.1%

Nearby

Within 50 km of this data center: 393 power plants (136 operating, 2,441 MW), 55 substations, 21 grid connections (11 operating, 101 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Ford Motor Company Ltd (Extension)Power plant2 MWOperating2.5 km
Chequers LanePower plant2.5 MWCancelled2.6 km
Ford Wind Park - DagenhamPower plant5.9 MWOperating3.5 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating9.3 km
North London (Electricity Line) ReinforcementTransmission line—Permitted17 km
Tertiary Study grid connectionGrid connection57 MWPlanned19 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating25 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating28 km
Volt Avenue PrimarySubstation——30 km

Operator and place

More from NTT Limited

Other data centers in England

All 245 data centers in England, United Kingdom

Data on this page