Power plant · Redcar and Cleveland, England, United Kingdom

Teesworks Battery Storage Project

Teesworks Battery Storage Project is a cancelled power plant in Redcar and Cleveland, England, United Kingdom, with 1,000 MW of capacity, operated by Teesworks Ltd, NatPower UK.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationRedcar and Cleveland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressTeesworks, Steel House Gate, TS10 5QWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date19 Dec 2024 (reference R/2024/0843/FFM, planning authority Redcar and Cleveland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 Aug 2025 (withdrawn, reference R/2024/0843/FFM, planning authority Redcar and Cleveland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorTeesworks Ltd, NatPower UKDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1,000 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.6103, -1.1051DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Teesworks Battery Storage Project is the 7th-largest of 3,430 power plants in England and the 9th-largest of 5,050 in the United Kingdom by capacity; its 1,000 MW is 0.86% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England7th of 3,43071,985 MW1.4%
United Kingdom9th of 5,050115,642 MW0.86%
All power plants in our data336th of 12,0081,173,302 MW<0.1%

Nearby

Within 50 km of this power plant: 228 grid connections (118 operating, 1,202 MW), 123 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Teesside Windfarm Ltd grid connectionGrid connection62 MWOperating1.1 km
RedcarSubstation——3.0 km
Gas 12 MW grid connection at GrangetownGrid connection12 MWOperating4.0 km
Landfill gas 2.027 MW grid connection at GrangetownGrid connection2.03 MWOperating4.1 km
GrangetownSubstation——4.3 km
Tees Industrial T1 T2Substation——4.3 km
Data center, Redcar (OSM way 1055031579)Data center——5.1 km
Lumen Technologies data center, MiddlesbroughData center——9.1 km
DXC Wynyard Data CenterData center——13 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom