Power plant · North Yorkshire, England, United Kingdom

Cayton Solar farm

Cayton Solar farm is a permitted power plant in North Yorkshire, England, United Kingdom, with 49.9 MW of capacity, operated by Elgin Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Yorkshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressHigh Cayton, Water Lane To Cayton, South Stainley, Harrogate, North Yorkshire, HG3 3NBDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date13 Jan 2022 (permit 19/02259/FULMAJ, Town and Country Planning Act, issued by North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date14 Jun 2019 (reference 19/02259/FULMAJ, planning authority North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date13 Jan 2022 (granted, reference 19/02259/FULMAJ, planning authority North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorElgin EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area85 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.0692, -1.5529DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Cayton Solar farm is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England514th of 2,174186,088 MW<0.1%
United Kingdom886th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,966th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 256 grid connections (129 operating, 1,312 MW), 245 substations, 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar 49 MW grid connection at High Cayton Solar DirectGrid connection49 MWPlanned0.9 km
Solar 24 MW grid connection at Fawcett PVGrid connection24 MWPlanned1.8 km
Wormald Green 132/11kV DirectSubstation——2.1 km
Wormald Green 132/33kVSubstation——2.1 km
Battery storage and Solar 16 MW grid connection at Wormald Green 132/11kV DirectGrid connection16 MWPlanned2.5 km
KnaresboroughSubstation——5.9 km
VocaLinkData center——10 km
Yorkshire GREENTransmission line—Permitted26 km
GridJetData center——32 km

Operator and place

More from Elgin Energy

Other power plants in England

All 5809 power plants in England, United Kingdom