Power plant · Newark and Sherwood, England, United Kingdom
Foxholes Farm, Bathley Lane - Solar Farm
Foxholes Farm, Bathley Lane - Solar Farm is a cancelled power plant in Newark and Sherwood, England, United Kingdom, with 49.9 MW of capacity, operated by Elgin Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Newark and Sherwood (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Foxholes Farm, Bathley Lane, North Muskham, NG23 6DW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (planning permission refused) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 28 Nov 2022 (reference 22/01983/FULM, planning authority Newark and Sherwood) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 8 May 2026 (refused, reference 22/01983/FULM, planning authority Newark and Sherwood) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Elgin Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 49.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 75.4 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.1386, -0.8336 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit refused (planning authority Newark and Sherwood, reference 22/01983/FULM)
- Permit applied for (planning authority Newark and Sherwood, reference 22/01983/FULM)
How it compares
Foxholes Farm, Bathley Lane - Solar Farm is the 175th-largest of 3,430 power plants in England and the 362nd-largest of 5,050 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 175th of 3,430 | 71,965 MW | <0.1% |
| United Kingdom | 362nd of 5,050 | 115,622 MW | <0.1% |
| All power plants in our data | 1,865th of 12,032 | 1,190,447 MW | <0.1% |
Nearby
Within 50 km of this power plant: 89 grid connections (47 operating, 587 MW), 78 substations, 4 data centers and 4 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Digital Space DC - Newark | Data center | — | — | 7.2 km |
| Hall Water Treatment Works grid connection | Grid connection | 1.6 MW | Operating | 14 km |
| Newton on Trent Water Works grid connection | Grid connection | 3.1 MW | Operating | 16 km |
| Stow | Substation | — | — | 22 km |
| Stow Park Road grid connection | Grid connection | 1.19 MW | Operating | 23 km |
| Lea Road | Substation | — | — | 28 km |
| nLighten Nottingham | Data center | — | — | 29 km |
| Corringham Road | Substation | — | — | 30 km |
| Experian | Data center | — | — | 36 km |
Operator and place
More from Elgin Energy
- Fernishaw Solar Farm & Battery Energy Storage Facility75 MW · permitted
- Queenslaine Farm, Highworth Road - Battery Energy Storage System66 MW · permitted
- Milltown Airfield (Speyslaw)50 MW · permitted
- Wemyss Estate - Randolph Solar Farm & Battery Energy Storage50 MW · permitted
- North Cote Farm & Park Farm, Dunsdale - Solar Arrays49.9 MW · permitted
- Cayton Solar farm49.9 MW · permitted
- Hanwell Estate, Main Street - Solar Farm40 MW · planned
- Hale Solar Farm40 MW · planned
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.