Power plant · Somerset, England, United Kingdom

Bushfurlong Solar Farm

Bushfurlong Solar Farm is a cancelled solar power plant in Somerset, England, United Kingdom, with 5 MW of capacity, operated by ZW Bushfurlong Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceBUSHFURLONG SOLAR FARMDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
LocationSomerset (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBushfurlong Farm, Bushfurlong Road, Isle Brewers, Taunton, TA3 6QSDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date18 Feb 2011 (reference 1100662FUL, planning authority Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date9 Dec 2011 (withdrawn, reference 1100662FUL, planning authority Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorZW Bushfurlong Ltd (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area15 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.9898, -2.8899DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Withdrawn (planning authority Somerset, reference 1100662FUL)
  2. Permit applied for (planning authority Somerset, reference 1100662FUL)

How it compares

Bushfurlong Solar Farm is the 2,173rd-largest of 4,036 power plants in England and the 3,291st-largest of 5,837 in the United Kingdom by capacity; its 5 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,173rd of 4,036134,406 MW<0.1%
United Kingdom3,291st of 5,837200,833 MW<0.1%
All power plants in our data9,138th of 13,0281,354,089 MW<0.1%

Nearby

Within 50 km of this power plant: 57 grid connections (36 operating, 267 MW), 34 substations, 2 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Larkhill PrimarySubstation——17 km
Bunford Park Development grid connectionGrid connection6.17 MWPlanned17 km
Fleet Air Arm Museum grid connectionGrid connection4.01 MWOperating17 km
Pipplepen Farm Solar PV grid connectionGrid connection32.6 MWPlanned18 km
West Hendford PrimarySubstation——18 km
Chilton Cantello PrimarySubstation——20 km
Tata Communications Highbridge DatacentreData center——27 km
Hinkley Point C ConnectionTransmission line—Permitted39 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned39 km

Operator and place

More from ZW Bushfurlong Ltd

Other power plants in England

All 5876 power plants in England, United Kingdom