Power plant · Fenland, England, United Kingdom

Boardinghouse Wind Farm

Boardinghouse Wind Farm is a power plant in Fenland, England, United Kingdom, with 10.3 MW of capacity, operated by Ecogen.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationFenland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressKnights End Road March CambridgeshireDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date6 Jul 2011 (permit F/YR09/0562/F, Town and Country Planning Act, issued by Fenland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date20 Aug 2009 (reference F/YR09/0562/F, planning authority Fenland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date14 Apr 2010 (refused, reference F/YR09/0562/F, planning authority Fenland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date6 Jul 2011 (granted, reference F/YR09/0562/F, planning authority Fenland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date6 Jul 2011 (appeal granted, reference F/YR09/0562/F, planning authority Fenland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEcogenDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity10.3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units5 units (2.05 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.5356, 0.0639DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Boardinghouse Wind Farm is the 1,085th-largest of 3,430 power plants in England and the 1,818th-largest of 5,050 in the United Kingdom by capacity; its 10.3 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,085th of 3,43071,985 MW<0.1%
United Kingdom1,818th of 5,050115,642 MW<0.1%
All power plants in our data6,953rd of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. F/YR09/0562/F
  2. Started operating

Nearby

Within 50 km of this power plant: 48 grid connections, 7 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Positive ParkData center——5.4 km
Crowland, French Farm Wind Farm grid connectionGrid connection——18 km
FEN Dyke Farm grid connectionGrid connection——22 km
Data center, England (OSM way 87850427)Data center——22 km
Decoy Farm, Organic Recycling Ltd grid connectionGrid connection——22 km
Longmarsh Green EnergyData center—Planned28 km
Kings Lynn B Connection ProjectTransmission line—Permitted29 km
Triton Knoll Electrical SystemTransmission line—Permitted48 km
Eastern Green Link 3 and Eastern Green Link 4Transmission line—Planned49 km

Operator and place

More from Ecogen

Other power plants in England

All 5809 power plants in England, United Kingdom