RARE CONTEXT Request research

Substation · England, United Kingdom

Chatteris Primary 11kV Substation

Chatteris Primary 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 0.4 MVA of demand headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Chatteris Primary 11kV lies
52.4558, 0.0396 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom0.4 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity20 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.4558, 0.0396UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 376 power plants (148 operating, 5,183 MW), 202 grid connections (130 operating, 2,209 MW), 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Land East Of Honeysome RoadPower plant4.6 MWOperating0.3 km
FDG A-14 Honeysome Road grid connectionGrid connection5 MWOperating0.4 km
Alan Bartlett & Sons SolarPower plant1.2 MWOperating0.5 km
Bartlett Business Park - Solar PanelsPower plant2.08 MWPermitted0.5 km
FDG A-08 Great Acre Fen Chatteris grid connectionGrid connection1.2 MWOperating0.8 km
FDG A-19 Chatteris Road 1 / Chatteris Road 2 grid connectionGrid connection1 MWOperating3.6 km
Positive ParkData center——14 km
Data center, England (OSM way 87850427)Data center——23 km
Redcentric CambridgeData center——26 km

Grid operator and place

Grid connections attached to this substation

More from Eastern Power Networks plc

Other substations in England

All 2633 substations in England, United Kingdom

Data on this page