RARE CONTEXT Request research

Grid connection · England, United Kingdom

Floods Ferry Wind grid connection

Floods Ferry Wind grid connection is a planned grid connection in England, United Kingdom, with 93.6 MW of capacity, held by Ashton Abraham Limited.

Map: where Floods Ferry Wind grid connection lies
52.5317, 0.0127 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at March Grid 132/33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderAshton Abraham LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity93.6 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date18 Jan 2026UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.5317, 0.0127UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Floods Ferry Wind grid connection is the 426th-largest of 3,539 grid connections in England and the 545th-largest of 4,870 in the United Kingdom by capacity; its 93.6 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England426th of 3,539341,715 MW<0.1%
United Kingdom545th of 4,870467,981 MW<0.1%
All grid connections in our data3,324th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 358 power plants (139 operating, 5,009 MW), 87 substations, 7 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Knights End Road Solar FarmPower plant5 MWCancelled0.7 km
Greenvale AP Wind TurbinePower plant1.5 MWOperating1.5 km
Floods Ferry FarmPower plant18 MWCancelled1.5 km
March Primary 11kVSubstation——3.7 km
March Grid 33kVSubstation——5.3 km
Positive ParkData center——6.5 km
Chatteris Primary 11kVSubstation——8.6 km
Data center, England (OSM way 87850427)Data center——19 km
Longmarsh Green EnergyData center—Planned31 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page