Power plant · North Yorkshire, England, United Kingdom

Arbour Hill Power Station

Arbour Hill Power Station is a cancelled biomass power plant in North Yorkshire, England, United Kingdom, with 1 MW of capacity, operated by Arbour Hill Biogas.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Yorkshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressField at, Patrick Brompton, Bedale, DL8 1JXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date6 Jul 2015 (reference 15/00523/FULL, planning authority North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date5 Oct 2015 (refused, reference 15/00523/FULL, planning authority North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorArbour Hill Biogas (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyAnaerobic DigestionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.3292, -1.6558DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority North Yorkshire, reference 15/00523/FULL)
  2. Permit applied for (planning authority North Yorkshire, reference 15/00523/FULL)

How it compares

Arbour Hill is the 3,882nd-largest of 4,035 power plants in England and the 5,619th-largest of 5,834 in the United Kingdom by capacity; its 1 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,882nd of 4,035134,434 MW<0.1%
United Kingdom5,619th of 5,834200,500 MW<0.1%
All power plants in our data15,551st of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 185 grid connections (90 operating, 1,143 MW), 102 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar 25 MW grid connection at David AndersonGrid connection25 MWPlanned2.8 km
East Appleton Farm grid connectionGrid connection4.5 MWOperating3.5 km
East Appleton Farm grid connectionGrid connection4.5 MWOperating3.5 km
BedaleSubstation——6.1 km
Leeming Bar/SkeebySubstation——6.3 km
Catterick CampSubstation——7.0 km
Pulsant data center, EnglandData center——33 km
Lumen Technologies data center, MiddlesbroughData center——39 km
VocaLinkData center——40 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page