Advanced Conversion Technologies 8 MW (REPD 988)
Advanced Conversion Technologies 8 MW (REPD 988) is a cancelled power plant in Wakefield, England, United Kingdom, with 8 MW of capacity, operated by Clean Power Properties & Network Rail Infrastructure.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Wakefield (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Castleford Wakefield WF10 2PP | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (planning permission refused) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 9 Jan 2014 (reference 13/03470/FUL, planning authority Wakefield) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 17 Jul 2014 (refused, reference 13/03470/FUL, planning authority Wakefield) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Clean Power Properties & Network Rail Infrastructure | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 8 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Advanced Conversion Technologies | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.7314, -1.3318 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Advanced Conversion Technologies 8 MW (REPD 988) is the 1,342nd-largest of 3,430 power plants in England and the 2,176th-largest of 5,050 in the United Kingdom by capacity; its 8 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,342nd of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 2,176th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 7,598th of 12,008 | 1,173,302 MW | <0.1% |
Nearby
Within 50 km of this power plant: 439 grid connections (215 operating, 2,334 MW), 380 substations, 11 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Smith Street | Substation | — | — | 0.5 km |
| Waste 9.69 MW grid connection at Wheldale Generation | Grid connection | 9.69 MW | Operating | 0.6 km |
| Carr Lane | Substation | — | — | 2.0 km |
| Wellington Street | Substation | — | — | 2.3 km |
| Battery storage 49.9 MW grid connection at Ledston BESS | Grid connection | 49.9 MW | Planned | 2.3 km |
| Battery storage 100 MW grid connection at Fryston Lane BESS Direct | Grid connection | 100 MW | Planned | 2.8 km |
| HSBC Wakefield Data Centre | Data center | — | — | 4.3 km |
| nLighten Leeds | Data center | — | — | 5.6 km |
| GridJet | Data center | — | — | 17 km |
Operator and place
More from Clean Power Properties & Network Rail Infrastructure
- Washwood Heath8 MW
- Willesden8 MW
- Micheldever8 MW
- Willesden2 MW
- Micheldever Rail Sidings EFW2 MW
- Wheldon Road2 MW
- Washwood Heath2 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.