Wellington Street
Wellington Street is a substation in England, United Kingdom, connected by Northern Powergrid (Yorkshire) plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Grid operator | Northern Powergrid (Yorkshire) plc | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Demand headroom | 4.89 MVA | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Generation headroom | 12.7 MW | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Firm capacity | 23 MVA | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Level | Primary | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Fed from | Featherstone | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Fed from | Ferrybridge B | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Congestion (offtake) | Limited (rag: Amber) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Congestion (feed-in) | Limited (rag: Amber) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Voltage | 11 kV | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Coordinates | 53.7255, -1.3646 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
Know more about this substation, or want an introduction to its grid operator? Ask us.
Nearby
Within 50 km of this substation: 440 grid connections (219 operating, 2,364 MW), 407 power plants (110 operating, 4,100 MW) and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Advanced Conversion Technologies 8 MW (REPD 988) | Power plant | 8 MW | Cancelled | 2.3 km |
| Wheldon Road | Power plant | 2 MW | Cancelled | 2.3 km |
| Battery storage 49.9 MW grid connection at Ledston BESS | Grid connection | 49.9 MW | Planned | 2.5 km |
| Wakefield Group Data Centre grid connection | Grid connection | 32 MW | Operating | 2.6 km |
| Wakefield Group Data Centre grid connection | Grid connection | 32 MW | Operating | 2.6 km |
| Newton Lane, Ledston - Battery Storage Facility | Power plant | 25 MW | Permitted | 2.7 km |
| Yorkshire GREEN | Transmission line | — | Permitted | 20 km |
| North Humber to High Marnham | Transmission line | — | Planned | 44 km |
Grid operator and place
Grid connections attached to this substation
More from Northern Powergrid (Yorkshire) plc
- Attercliffesubstation
- Barugh 132/66kVsubstation
- Beeston Royds 132/33kVsubstation
- Beverley 132/33kVsubstation
- Bingley 132/33kVsubstation
- Blackburn Meadows Bsubstation
- Blytonsubstation
- Bradfordsubstation
Other substations in England
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.