Grid connection · the United Kingdom
Stockhills Farm grid connection
Stockhills Farm grid connection is a planned grid connection in the United Kingdom, with 800 MW of capacity, held by BSR Applications Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | United Kingdom (connects at Severn Connection Node A 400kv Substation) | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Status | Planned (scoping) | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Holder | BSR Applications Limited | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Attached to | Stockhills Farm | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Capacity | 800 MW | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Technology | Energy Storage System | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Technology | PV Array (Photo Voltaic/solar) | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Grid operator | National Grid Electricity Transmission plc | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Connection date | 31 Oct 2037 | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Connection gate | Gate 1 | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its holder? Ask us.
How it compares
Stockhills Farm grid connection is the 243rd-largest of 3,903 grid connections in the United Kingdom by capacity; its 800 MW is 0.18% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| United Kingdom | 243rd of 3,903 | 446,745 MW | 0.18% |
| All grid connections in our data | 396th of 7,616 | 1,281,251 MW | <0.1% |
Holder, grid operator and place
More from BSR Applications Limited
- Cold Norton grid connection1,250 MW
- Heaten Hall Farm BESS grid connection240 MW
- Heaten Hall Farm BESS+Wind grid connection240 MW
- Wester Covesea Solar, Wind and Storage grid connection180 MW
- Land at Frog Lane grid connection70 MW
- North Dairy Farm - Solar PV (Flexible Connection) grid connection50 MW
- The Knells Solar grid connection49.9 MW
- Stroud Farm Solar and Storage grid connection36 MW
Other grid connections in United Kingdom
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. Checked 2026-10-24. CAISO queue report, CAISO Privacy and Terms of Use.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.