Grid connection · Scotland, United Kingdom

Wardhill Farm BESS grid connection

Wardhill Farm BESS grid connection is a planned grid connection in Scotland, United Kingdom, with 50 MW of capacity, held by Qair Renewables UK Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceWARDHILL FARM BESS grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Rothienorman)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderQair Renewables UK LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toRothienorman GSP (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity50 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date19 Jan 2026SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date19 Jan 2031 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates57.3718, -2.4796SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Wardhill Farm BESS grid connection is the 220th-largest of 1,192 grid connections in Scotland and the 804th-largest of 3,903 in the United Kingdom by capacity; its 50 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland220th of 1,19288,894 MW<0.1%
United Kingdom804th of 3,903446,745 MW<0.1%
All grid connections in our data4,076th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 251 power plants (75 operating, 817 MW), 89 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Fairfield - Battery Energy Storage SystemPower plant49.9 MWCancelled1.6 km
Hill Of RothmaisePower plant4.6 MWCancelled3.6 km
Middleton Of Blackhills, Rothienorman - Battery Energy Storage SystemPower plant49.9 MWPlanned4.4 km
Rothienorman GSPSubstation——4.8 km
Fyvie PrimarySubstation——8.3 km
Insch PrimarySubstation——8.6 km
BrightsolidData center——31 km

Holder, grid operator and place

More from Qair Renewables UK Limited

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page