Grid connection · Scotland, United Kingdom
South Clyde Energy Centre grid connection
South Clyde Energy Centre grid connection is a planned grid connection in Scotland, United Kingdom, with 45 MW of capacity, held by Fortum Glasgow Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Scotland (connection site: Braehead Park) | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (Accepted to Connect) | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | Fortum Glasgow Limited | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 45 MW | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Landfill gas | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | SP Distribution plc | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Queue date | 10 Jul 2020 | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 14 Jul 2026 (target energisation) | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its holder? Ask us.
How it compares
South Clyde Energy Centre grid connection is the 325th-largest of 1,192 grid connections in Scotland and the 1,071st-largest of 3,903 in the United Kingdom by capacity; its 45 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 325th of 1,192 | 88,894 MW | <0.1% |
| United Kingdom | 1,071st of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 4,186th of 7,616 | 1,281,251 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Connected
Holder, grid operator and place
More from Fortum Glasgow Limited
Other grid connections in Scotland
- Marram Wind Offshore Wind Farm grid connection3,000 MW
- OWPL Windfarm grid connection2,250 MW
- Caledonia Offshore Wind Farm grid connection2,000 MW
- Machair Offshore Wind Farm grid connection2,000 MW
- Arven Offshore Wind Farm grid connection1,800 MW
- Bellrock Offshore Wind Farm grid connection1,800 MW
- Earba PSH grid connection1,800 MW
- Glen Earrach PSH grid connection1,800 MW
Data on this page
- CAISO queue report. CAISO queue report, CAISO Privacy and Terms of Use.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, No restriction on the posted data.
- PJM New Services Queue. PJM New Services Queue, No restriction on the posted data.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.