Grid connection · Scotland, United Kingdom
Pusk Farm Solar and BESS grid connection
Pusk Farm Solar and BESS grid connection is a planned grid connection in Scotland, United Kingdom, with 109 MW of capacity, held by Greentech Projects Holding UK Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Scotland (connection site: Cupar) | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (Accepted to Connect) | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | Greentech Projects Holding UK Limited | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 109 MW | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Battery storage | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Solar | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | SP Distribution plc | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Queue date | 4 Oct 2024 | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 30 Oct 2032 (target energisation) | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its holder? Ask us.
How it compares
Pusk Farm Solar and BESS grid connection is the 65th-largest of 1,518 grid connections in Scotland and the 400th-largest of 4,493 in the United Kingdom by capacity; its 109 MW is <0.1% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 65th of 1,518 | 96,638 MW | 0.11% |
| United Kingdom | 400th of 4,493 | 459,551 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Holder, grid operator and place
More from Greentech Projects Holding UK Limited
- Seggiecrook Farm BESS and Solar grid connection126 MW
- Pusk Farm Solar and BESS grid connection109 MW
- Brownside Farm grid connection35.2 MW
- 28MW Mains of DUN PV grid connection28 MW
- Aberdour Solar Farm grid connection25 MW
- Wellbank grid connection25 MW
- Sheepbridge Court Farm Cottages grid connection19 MW
- Lower House Farm grid connection12 MW
Other grid connections in Scotland
- Marram Wind Offshore Wind Farm grid connection3,000 MW
- OWPL Windfarm grid connection2,250 MW
- Caledonia Offshore Wind Farm grid connection2,000 MW
- Machair Offshore Wind Farm grid connection2,000 MW
- Arven Offshore Wind Farm grid connection1,800 MW
- Bellrock Offshore Wind Farm grid connection1,800 MW
- Earba PSH grid connection1,800 MW
- Glen Earrach PSH grid connection1,800 MW
Data on this page
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.