Grid connection · Scotland, United Kingdom

Phase 2 Windfarm grid connection

Phase 2 Windfarm grid connection is a grid connection in Scotland, United Kingdom, with 2.28 MW of capacity, held by Hill of Blairfowl Wind Farm Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourcePHASE 2 WINDFARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Kintore Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderHill of Blairfowl Wind Farm LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toKintore GSP (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity2.28 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage11 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates57.4178, -2.3366SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Phase 2 Windfarm grid connection is the 997th-largest of 1,192 grid connections in Scotland and the 3,260th-largest of 3,903 in the United Kingdom by capacity; its 2.28 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland997th of 1,19288,894 MW<0.1%
United Kingdom3,260th of 3,903446,745 MW<0.1%
All grid connections in our data7,264th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 230 power plants (67 operating, 686 MW), 83 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
St Johns Wells Wind Cluster ExtensionPower plant3.2 MWOperating0.4 km
DenhillPower plant2.3 MWOperating0.6 km
St John's WellPower plant2.4 MWOperating1.5 km
Fyvie PrimarySubstation——3.3 km
Methlick PrimarySubstation——5.5 km
Oldmeldrum PrimarySubstation——9.2 km
BrightsolidData center——31 km