Grid connection · Scotland, United Kingdom

MID Whitestones Farm grid connection

MID Whitestones Farm grid connection is a planned grid connection in Scotland, United Kingdom, with 9.9 MW of capacity, held by Locogen Solar Developments Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceMID WHITESTONES FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Strichen Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderLocogen Solar Developments LtdSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toStrichen Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity9.9 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date30 Mar 2022SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2027 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates57.5588, -2.2770SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

MID Whitestones Farm grid connection is the 690th-largest of 1,192 grid connections in Scotland and the 2,154th-largest of 3,903 in the United Kingdom by capacity; its 9.9 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland690th of 1,19288,894 MW<0.1%
United Kingdom2,154th of 3,903446,745 MW<0.1%
All grid connections in our data6,049th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 208 power plants (64 operating, 497 MW), 72 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Bogenlea FarmPower plant2.3 MWOperating1.6 km
Hillhead of BonnykellyPower plant2.3 MWCancelled2.2 km
Whitestones, Cuminestown - Solar FarmPower plant9.9 MWPermitted2.9 km
New Pitsligo PrimarySubstation——5.7 km
Maud PrimarySubstation——10 km
Turriff PrimarySubstation——11 km
BrightsolidData center——46 km

Holder, grid operator and place

More from Locogen Solar Developments Ltd

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom