Grid connection · Scotland, United Kingdom

Glenniston Solar and BESS grid connection

Glenniston Solar and BESS grid connection is a planned grid connection in Scotland, United Kingdom, with 55.8 MW of capacity, held by Locogen.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotland (connects at Glenniston)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderLocogenSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity55.8 MWSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSP Distribution plcSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date1 Oct 2024SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date19 Jul 2028 (target energisation)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Glenniston Solar and BESS grid connection is the 161st-largest of 1,192 grid connections in Scotland and the 720th-largest of 3,903 in the United Kingdom by capacity; its 55.8 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland161st of 1,19288,894 MW<0.1%
United Kingdom720th of 3,903446,745 MW<0.1%
All grid connections in our data3,923rd of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Holder, grid operator and place

More from Locogen

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page