Power plant · South Ayrshire, Scotland, United Kingdom
Loch Fergus Farm - Solar Farm
Loch Fergus Farm - Solar Farm is a power plant under construction in South Ayrshire, Scotland, United Kingdom, with 40 MW of capacity, operated by Locogen.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | South Ayrshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Loch Fergus Farm, KA6 6ER | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Under construction | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 22 Oct 2024 (permit ECU00004855, Electricity Act 1989 section 36, issued by Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 3 Jul 2023 (reference ECU00004855, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 22 Oct 2024 (granted, reference ECU00004855, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Locogen | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 40 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 58.2 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 55.4345, -4.5420 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Construction started
- Permit granted (planning authority Scottish Government (S36), reference ECU00004855)
- Permit applied for (planning authority Scottish Government (S36), reference ECU00004855)
How it compares
Loch Fergus Farm - Solar Farm is the 446th-largest of 872 power plants planned, permitted or under construction in Scotland and the 1,342nd-largest of 3,222 in the United Kingdom by capacity; its 40 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 446th of 872 | 99,272 MW | <0.1% |
| United Kingdom | 1,342nd of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,556th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 3 substations, 2 grid connections and 2 data centers, measured from the coordinates in the facts above.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Whiting Bay Primary | Substation | — | — | 36 km |
| Glenkiln Farm grid connection | Grid connection | 4 MW | Planned | 40 km |
| Brodick Primary | Substation | — | — | 41 km |
| Ballochmartin Farm grid connection | Grid connection | 3.5 MW | Planned | 44 km |
| Asanti Hamilton | Data center | — | — | 47 km |
| Bruchag Primary | Substation | — | — | 48 km |
| iomart Glasgow Data Centre | Data center | — | — | 49 km |
Operator and place
More from Locogen
- Teindland Wind Farm85 MW · planned
- Benthead Farm - Solar Farm & Battery Storage63 MW · permitted
- Loch Fergus Farm - Energy Storage System45 MW · under construction
- Benthead Farm - Solar Farm & Battery Storage31.1 MW · permitted
- Squirrel Lane - Solar Photovoltaic Farm12 MW
- Whitestones, Cuminestown - Solar Farm9.9 MW · permitted
- Hill of Tillymorgan (Kirkton Farm) Wind turbines9.6 MW
- Limolands Farm5 MW
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.