Grid connection · Scotland, United Kingdom

Dunwan Dam Wind Farm grid connection

Dunwan Dam Wind Farm grid connection is a planned grid connection in Scotland, United Kingdom, with 24.8 MW of capacity, held by Wind Estate (UK) Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotland (connects at Giffnock)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderWind Estate (UK) Ltd.SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity24.8 MWSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSP Distribution plcSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date27 Feb 2024SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2033 (target energisation)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Dunwan Dam Wind Farm grid connection is the 507th-largest of 1,192 grid connections in Scotland and the 1,516th-largest of 3,903 in the United Kingdom by capacity; its 24.8 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland507th of 1,19288,894 MW<0.1%
United Kingdom1,516th of 3,903446,745 MW<0.1%
All grid connections in our data5,091st of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Holder, grid operator and place

More from Wind Estate (UK) Ltd.

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page