Grid connection · Scotland, United Kingdom

Donich Hydro Scheme grid connection

Donich Hydro Scheme grid connection is a grid connection in Scotland, United Kingdom, with 1.28 MW of capacity, held by Broadland Energy (Donich) Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceDONICH HYDRO SCHEME grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Lochgoilhead)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderBroadland Energy (Donich) LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toLochgoilhead Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toDonich Water Hydro (matched by shared name+coordinates+technology+capacity+company, 1.4 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity1.28 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyHydroSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro ElectricSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date12 Aug 2016SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage11 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.1782, -4.8959SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Commissioned: Donich Water Hydro
  2. Permit granted: Donich Water Hydro (planning authority Argyll and Bute, reference 2013/0120/DET)
  3. Permit applied for: Donich Water Hydro (planning authority Argyll and Bute, reference 2013/0120/DET)

How it compares

Donich Hydro Scheme grid connection is the 1,146th-largest of 1,192 grid connections in Scotland and the 3,685th-largest of 3,903 in the United Kingdom by capacity; its 1.28 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland1,146th of 1,19288,894 MW<0.1%
United Kingdom3,685th of 3,903446,745 MW<0.1%
All grid connections in our data7,701st of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 150 power plants (37 operating, 1,242 MW) and 58 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Lochgoilhead PrimarySubstation——0.4 km
Donich Water HydroPower plant1.4 MWOperating1.4 km
Douglas Pier PrimarySubstation——2.7 km
Creag DhubhPower plant27 MWPlanned7.5 km
Butterbridge PrimarySubstation——7.8 km
Sloy Hydroelectric Power Station - Pumped Hydro ConversionPower plant100 MWPlanned11 km