Clashindarroch Wind Farm 2 - Addcap grid connection

Clashindarroch Wind Farm 2 - Addcap grid connection is a planned grid connection in Scotland, United Kingdom, with 77 MW of capacity, held by Vattenfall Wind Power Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceCLASHINDARROCH WIND FARM 2 - ADDCAP grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Cairnford)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderVattenfall Wind Power LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toCairnford GSP (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity77 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date24 May 2019SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Aug 2026 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates57.4058, -2.9542SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Clashindarroch Wind Farm 2 - Addcap grid connection is the 88th-largest of 1,192 grid connections in Scotland and the 559th-largest of 3,903 in the United Kingdom by capacity; its 77 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland88th of 1,19288,894 MW<0.1%
United Kingdom559th of 3,903446,745 MW<0.1%
All grid connections in our data3,598th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 186 power plants (59 operating, 842 MW) and 54 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Clashindarroch 2Power plant77 MWPermitted2.7 km
Clashindarroch Wind Farm ExtensionPower plant139 MWPermitted6.0 km
ClashindarrochPower plant37 MWOperating6.9 km
Cairnford GSPSubstation——8.1 km
Huntly PrimarySubstation——11 km
Dufftown PrimarySubstation——11 km

Holder, grid operator and place