Grid connection · Scotland, United Kingdom
Clashindarroch Wind Farm 2 - Addcap grid connection
Clashindarroch Wind Farm 2 - Addcap grid connection is a planned grid connection in Scotland, United Kingdom, with 77 MW of capacity, held by Vattenfall Wind Power Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | CLASHINDARROCH WIND FARM 2 - ADDCAP grid connection | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | Scotland (connects at Cairnford) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | Vattenfall Wind Power Limited | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Cairnford GSP (via a primary substation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 77 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Wind | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Scottish Hydro Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Queue date | 24 May 2019 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 31 Aug 2026 (target energisation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 57.4058, -2.9542 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchHow it compares
Clashindarroch Wind Farm 2 - Addcap grid connection is the 88th-largest of 1,192 grid connections in Scotland and the 559th-largest of 3,903 in the United Kingdom by capacity; its 77 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 88th of 1,192 | 88,894 MW | <0.1% |
| United Kingdom | 559th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 3,598th of 7,928 | 1,372,494 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Was due to connect; the register does not list it as connected
Nearby
Within 50 km of this grid connection: 186 power plants (59 operating, 842 MW) and 54 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Clashindarroch 2 | Power plant | 77 MW | Permitted | 2.7 km |
| Clashindarroch Wind Farm Extension | Power plant | 139 MW | Permitted | 6.0 km |
| Clashindarroch | Power plant | 37 MW | Operating | 6.9 km |
| Cairnford GSP | Substation | — | — | 8.1 km |
| Huntly Primary | Substation | — | — | 11 km |
| Dufftown Primary | Substation | — | — | 11 km |
Holder, grid operator and place
More from Vattenfall Wind Power Limited
- Thanet Extension Offshore Wind Farm340 MW
- Redmere Wind Farm303 MW · planned
- Ray II Wind Farm166 MW · planned
- Chatteris Wind Farm126 MW · planned
- Quantans Hill Wind Farm96 MW · planned
- Quantans Hill Wind Farm50 MW · planned
- Ledburn, Mentmore - Solar Farm49.9 MW · permitted
- Ray Battery Storage Facility20 MW
Other grid connections in Scotland
- Marram Wind Offshore Wind Farm grid connection3,000 MW
- OWPL Windfarm grid connection2,250 MW
- Caledonia Offshore Wind Farm grid connection2,000 MW
- Machair Offshore Wind Farm grid connection2,000 MW
- Arven Offshore Wind Farm grid connection1,800 MW
- Bellrock Offshore Wind Farm grid connection1,800 MW
- Earba PSH grid connection1,800 MW
- Glen Earrach PSH grid connection1,800 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.